Imagine quoting for a job and losing out to the competition, only to be called back a few months later by the same client who now wants you to make good the cock-ups of their chosen installer after things went bad. Well, there's a plot-twist to this one; see if you can guess it before the end!


Nobody likes a smartarse, so I won’t begin by saying ‘I told you so’, but... uh... in this case I did specifically say at the end of my quotation paperwork:

“If you are securing pricing from other electricians, check the Registered Competent Persons database at http://www.electricalcompetentperson.co.uk/ to ensure they are accredited. Non-accredited installers will not show up on a search and may not be able to provide the Building Regulations certificate of compliance.”

I really do get sick of typing that sentence. It’s there on my quotation template, but it is frustrating the amount of emails I answer where I have to mention the existence Electrical Competent Persons database and why any homeowner should check it before letting anyone loose on their electrical installation. In this case, the installer who has performed the electrical work is not accredited and does not appear on the database, yet despite my advice the client has proceeded to appoint them to undertake work which falls under Part-P of the Building Regulations.

The only way for this installer to have accepted this job and legally complied with the building regs is to first submit a planning application to Warwick District Council before they started on site. Of course, they didn’t do that, so now the homeowner lacks the paperwork which should have gone with the job. That’s a problem because it leaves them legally liable for the alterations which can invalidate their insurance, cause a headache when renting or selling the property (they do rent a room to a student lodger), or leave them in hot water if the Local Authority Building Control come a-calling, because it is now their responsibility to prove the work was undertaken correctly, and they cannot do so now without appointing an approved third party to perform an Electrical Installation Condition Report on the whole of the electrical installation and at their own expense.

Lack of accreditation also means there’s no Competent Persons Scheme to file a complaint with. If the installer had been accredited with a CPS then a complaint to the CPS would have seen the installer leant on to cough up outstanding paperwork and make good any valid complaints the client had about the work or the invoicing.

Now, I have known these clients for years and had done prior work for them on several occasions which they had been happy with, so when asked to provide pricing for their new kitchen back in January I gave them a written scope of works detailing what I would do and how much it would cost, priced as favourably as possible as always.

I didn’t hear back, and I was too busy to chase, so I assumed the project had either stalled or they had used someone else. It turns out to have been the latter, as at the beginning of August I was contacted by the clients and told the chosen electricians had apparently botched the job and disappeared leaving things unfinished. They wanted me to come around to assess the work and put right the damage.

What I should have done, and what I will only do from now on in such cases, for reasons to be explained later, is to have offered to perform a paid electrical inspection of the work with the aim of producing a report detailing the explicit faults. Instead I offered to undertake the remedial work and write a report as I went along, much of which is contained as part of this article, so that the clients could go to Trading Standards/small claims court/private action of whatever kind against their installer in an attempt to get some of their money back. Of course, I would be charging for my time and any supplied materials, and documenting all that had been made good along the way. The advantage to the clients of doing it this way would be that the stuff that was bad or not working would be put right sooner rather than remaining dangerous or non-functional while arguments or legal action dragged on.

Anyway, I know you’re all eager to see some horror shots, so enough of my perfunctory waffle, let’s see how this homeowner’s long-awaited dream kitchen has been ruined by the actions of non-accredited bodgers who clearly don’t know what they’re doing....

We’ll start with accessory levelling. The correct way to do this, from my experience, is to pass a self-levelling laser line through the lugs of the knockout boxes when mounted on the wall. If the laser passes through all the lugs of all the boxes, then you can be assured your sockets and switches will line up on second fix. Here I don’t know what they've used; certainly not a laser. Not even a tape measure and spirit level it seems, because all accessories are either hopelessly on the piss or not at all in line.

IMAG1640


IMAG1641

IMAG1642

IMAG1643

It’s sloppy attention to detail and lack of forward planning during the dusty, dirty first fix stage which lets down the final appearance once everything has been plastered and painted. The homeowner told me she could see the boxes hadn’t been mounted level and queried it with the installer who assured her it would be sorted out on second fix. Of course, by second fix the boxes are plastered into the wall, so it’s no small task to adjust them. If they are ever to be level, then the plaster will have to be chiselled out around them so they can be reseated, then made good with filler and repainting.

Speaking of plastering, what the hell is this...??

IMAG1638

These cables haven’t been sunk deeply enough into the walls and someone has made a half-arse effort to slap some filler over them like that’s going to make things better! A professional would have put in a deeper chase and capped the cables with steel or plastic to prevent them getting nicked by the plasterer’s trowel. This is a visible section of wall, not one hidden from view, and kitchen fittings have been placed below it so getting this made good now is going to be very tricky. The best bet is probably to cover it with a wide conduit painted to match the walls, but who wants to see conduit when the opportunity was there to bury the cables and achieve a flush finish?

The installer had fitted undercupboard LED strips, but only one of the three strips was operational. The clients told me the installer had spent 'a couple of hours’ trying to figure out the problem before blaming a bad LED driver. Inside of two minutes, I had placed a voltmeter on the output of the LED driver and confirmed 12V DC was present, then tracked down the bad connection to incorrectly fitted end-connectors on the strips. The clients were rather surprised to watch me bring the other two strips to life so soon after walking through the front door and with nothing but a voltmeter and my fingernail to prise the end-connector open with.

IMAG1658

If the prior installer couldn’t diagnose a simple issue as quickly and easily, and if they did spend so long on it before misdiagnosing the fault completely, then just how incompetent are they?

Besides, some of the accessories were cheap and nasty. I put a two year no-quibble warranty on anything I supply and install, and I don’t want to lose time and money through warranty call-outs so I supply kit I trust. Here, a no-brand LED strip had been installed under the cupboards, and although I got all three working, one had a noticeable flicker and needed replacing.

While all of the above throws an interesting light on the poor quality of the installer, we’ve yet so see anything that flouts the wiring regulations, so here comes the juicy stuff.....

The clients had a 16th Edition consumer unit which was about twenty years old. Okay, the lighting circuits weren’t RCD protected, but the CU was in good condition overall and was complaint with the standards of its time. Although alterations were happening to the electrical installation including a new circuit to be installed for the oven, only those new alterations had to be compliant with today’s standards (17th Edition Amendment 3 at the time of writing); overall the old CU remained fit for purpose. I had told the clients in January that the CU didn’t need to be changed and could accommodate the alterations, but for whatever reason, these jokers installed a new consumer unit.

That’s not necessarily a bad thing; at least all the circuits in the house are now RCD protected, however in my opinion it was an unnecessary expense which the clients were told was required after being fed duff information. Unfortunately, the upgrade has been done badly so the advantage of the additional protection afforded by hanging all circuits off RCD's is somewhat lost on the glaring regulatory non-compliances caused by the sloppy installation work.

Starting with this, the cable entries at the top of the CU. Regulation 416.2.2 requires the “horizontal top surface... of an enclosure... shall provide a degree of protection of at least IP4X”. To meet IP4X, a solid object 1mm or more in diameter should not be able to penetrate the enclosure. It is clear that the holes around these cables are far too large allowing dust, water leaks or foreign objects to enter the live consumer unit. Also there is missing edge strip around most of the sharp metal edges risking damage to the cable insulation.

IMAG1648

With such wide holes, a fire starting in the enclosure has a source of oxygen and escape, and I’m betting the main selling point for changing the CU was the line I so often hear about ‘plastic consumer units no longer being compliant’. Bull. Shit. That ony applies to the installation of new enclosures. An existing properly installed plastic CU will contain a fire better than this well-ventilated metal box! Anyway, I won’t get into the lies about plastic consumer units here, there’s a whole other article on that subject!

Things don’t get any better on the underside of the CU. The tails and main earth should be entering the enclosure via a gland to provide strain relief and protection from the sharp metal edges, but that costs the same as a pint of Guinness at a posh pub, so I guess they figured they’d spend the money elsewhere....

IMAG1646

Still, lack of strain relief on the tails isn’t likely to be a problem if the tails are secure, right?

IMAG1647

Yes, you’re seeing that right; those tails are not clipped or cleated to anything. They’re not even run against the wall. This is in an under-stairs cupboard filled with bags, brooms and other such items which are one day likely to catch around the flapping tails, so a good yank may well result in the tail insulation being damaged by the sharp CU edges or, perhaps over time, a loose connection forming at a main terminal which can lead to arcing, thermal damage and eventually the risk of short circuit or fire. Regulation 522.8.11 states “cable supports and enclosures shall not have sharp edges liable to damage the wiring system”, and the flapping tails contravene Regulations 522.8.1 and 522.8.5.

Also, notice the lack of an external isolator. In order to kill the power so they could change the CU, they have cut the supplier's seal and pulled the main fuse.

IMAG1645


Naughty naughty, the seal and fuse belong to the network operator and jobbing electricians lack the authority to meddle with either, although show me a sparkie who claims to have never cut a fuse seal and I’ll probably show you a liar! That said, when I have to change a CU where there’s no isolator, I arrange for an authorised installer to fit one beforehand. Sure, it adds to the cost of the job, but my name is my reputation, and if a client isn’t prepared to pay to have the job done properly in the first place then I’m happy to stay in bed while they go to the competition. Unfortunately, the work we’re seeing here is what a lot of my competition pass off as acceptable standards.

There is an RCD notice affixed to the new CU, but there is no two-colours label as required by Regulation 514.14.1. Although only the older colours are in use within the consumer unit enclosure, newer wiring colours exist within the installation, including as just installed in the new kitchen by these very fellas.

IMAG1650

This Hager consumer unit would have been supplied with a two-colours label, so its omission, like other aspects of the work we’ll see here, is inexplicable. It may be a minor detail, but it highlights how careless these people are. All they had to do was to slap on the sticker supplied with the new CU and Regulation 514.14.1 would have been complied with. It was that easy.

Although not technically a fault of the installer, one issue with some Hager brand consumer units is excessive exposed copper at the RCD terminals as shipped from the factory. Someone working on the board who has failed to follow safe isolation procedures is at risk of shock or short circuit if they make a slip. The installer should have modified these connections to eliminate the excessive exposed copper and removed the risk.

IMAG1652

When contacted, Hager said it’s okay as the board should not be worked on live (with its front cover opened), however installations without an external isolator cannot be fully isolated without removal of the supplier’s fuse, and some tests must be performed live such as external impedance, fault current measurement, polarity and phase rotation (where applicable). If I were to terminate circuits into the breakers with that much copper visible, NICEIC would be pulling me up for it on my assessment visits. It certainly shouldn’t be one rule for me, another for the manufacturer. Regardless of Hager’s opinion that it is acceptable, as a purchaser of consumer unit equipment I can say definitively that I don’t like it. Other installers have been vocal on Twitter about this same issue, so I hope Hager start listening.

The correct procedure before replacing a consumer unit is to perform a full inspection and testing of the entire electrical installation that is dependent on it. This includes all the final circuits, not just those being modified. A fully inspected and tested domestic installation can be signed off for up to ten years if in top condition, however only one year has been put on the label here. Why?

IMAG1653

Without any certification or documentation regarding the installation we have no test results or comments on why these installers are not confident in letting more than twelve months pass before a total re-inspection is necessary. Considering the installation work already seen, and that still to come, I wouldn’t trust these installers opinion even if they do claim to have performed a full electrical inspection, and only by appointing someone accredited, qualified, insured and approved for such work can we be confident the installation is safe for continued use.

I don’t like the generic T&I labels like that shown above as they give little detail. They comply with Regulation 514.12.1, but don’t tell you much of use. My labels give the dates as required, but they also have my company name, accreditation information, contact details and the unique certificate/report number which relates to the inspection date shown.

TIlabel

A label such as mine means any installer or new property owner can recognise who has performed electrical work, and by obtaining the cert it’ll show what that work was – new circuit, new CU or EICR. Even if the cert/report has been lost, a new copy can be requested from my files. It would be nice if the upcoming 18th Edition beefed up this kind of basic stuff, but that won’t happen because it sounds too much like common sense and the job of the I.E.T. is to sell expensive Regs books and increase the paperwork burden for installers who try to work legitimately. Let's hope the 18th Edition books lack the kind of errors seen in 2015 when the I.E.T. were caught snoozing and got their numbers wrong for disconnection times in the new yellow On Site Guide, forcing them to issue a hasty and embarrassing errata!

Moving on from the consumer unit crimes, we’ll see some other basic, *basic* horrors that nobody calling themselves an electrician should be performing. Like these....

IMAG1639

IMAG1655

Above is an undercabinet lighting transformer and one of eight downlights showing the outer sheath not entering the cord grip and, in the case of the transformer, with the earth wires cut off in defiance of Regulation 411.3.1.1 so that the outgoing cable to the next transformer has no circuit protective conductor.

Regulation 526.6 states “There shall be no appreciable mechanical strain on the connections of conductors” while Regulation 526.8 requires “cores of sheathed cables from which the sheath has been removed... shall be enclosed”. To comply with both of these regulations, the outer sheath of a cable must enter an accessory enclosure and be captured in any strain relief mechanism. Here we can see where the grey outer sheath has been cut back before entry into the enclosure and where the basic (brown/blue) insulation is exposed.

Let’s take a closer look at one of those downlights...

IMAG1665   IMAG1666

 

The inner insulation is being damaged through crushing by the cord grip, and incorrect termination at the terminal block has the screw going through the insulation. The latter can cause a high resistance joint which may eventually burn out. Dead testing and visual inspections will usually uncover such problems, but there is no evidence so far that any testing has been undertaken on this installation. As is, this does not comply with Regulation 526.1.

Metal light switches have been installed without being earthed as required by Regulation 411.3.1.1. Also, switch drops have not been sleeved to identify their function (Regulation 514.3.1). This is basic stuff. Real "electrics 101". How are they failing to earth metal accessories?

IMAG1668

It was also observed that the centre switch in a three-gang plate had been connected upside down (L2 terminal instead of L1) which meant that light operated in the opposite way to the other two switches. This highlights the lack of basic care and attention this installation has received.

IMAG1644

Not that the leftmost switch will ever do anything. It’s supposed to operate over-cupboard lighting, but instead of a line/neutral at the brown/blue wiring installed up there, only line/line is present. Obviously a miswire, but the junction has now been hidden somewhere, probably above the newly plastered and painted ceiling, so that isn’t going to get corrected without calling in a plasterer.

It is also the case that the boxes are clogged with plaster debris which can damage the wiring when the accessory is pushed into place and that the boxes are not earthed which they should be as exposed conductive parts (Regulation 411.3.1.1).

IMAG1661

Another issue with the downlights was that the holes cut into the ceiling were too big for the diameter of the cheap and nasty downlights they installed. This results in them sitting poorly, barely clinging onto the ceiling. One downlight was also observed to have a dented bezel which can only have resulted from a drop impact either during carriage or installation. The installer has proceeded with installation rather than replacing the dented unit.

Finally, one last picture to give you nightmares:

IMAG1637

Regulations 522 and 528 requires a wiring system to not be installed where they may be subject to external influences or in the proximity of non-electrical services unless specific conditions are met on protection or spacing. This is not the case here where the central heating cabling is to be found draped over the copper pipework.

Okay, I know what you’re thinking. Maybe this is like Cowboy Competition #5 where an inexperienced kitchen fitter did the electrical work and found a dodgy sparkie to sign it off without asking any questions? Well, no. Believe it or not, this is the work of an outfit working in my neighbourhood who claim to be "fully qualified, Part-P compliant electricians", and below is their website front page.

pulsebs2

Their homepage pushes data and A.V. cabling, so I reckon what we have here are a couple of A.V. guys who figured they could branch out from signal cabling into something of a higher voltage. Check out these website claims curiously set against a picture of an American style house:

pulsebs

Part-P certified electricians? Certified by whom? A check of the Electrical Competent Persons database under their company name or postcode shows no hits, so they are not accredited with any CPS scheme. The only way they can legitimately undertake Part-P work is by direct planning notification to Local Authority Building Control before they start the work. That’s an expensive business, but the client here hasn’t been handed any paperwork prior to work commencing, and I’ve asked them to request both the electrical installation certificate and building regulations compliance certificate (Part-P) for the consumer unit change, but this installer is only giving them radio silence in return.

Still, at least they’re not pretending to be affiliated with a CPS. Their website and advertising lacks any logos for NICEIC, NAPIT, Elecsa, Stroma or any other government approved CPS schemes. Many cowboys pretend to have affiliation, these guys have nothing. Maybe they don’t even know about CPS schemes or the requirements of the wiring and building regulations and they are indeed ill-informed A.V. monkeys who figured electrics would be an easy string to add to their bow without requiring too much research? The trouble is, if their website and advertising suggests they are aware of their responsibilities under Part-P then that may have led the kitchen fitter/homeowner to believe they would be supplied with the legal paperwork for the job. Under Consumer Protection from Unfair Trading Regulations (2008) legislation, a trader cannot undertake misleading action by deceiving clients to the nature of the goods or services they’re expecting to receive which may lead them into deciding how to proceed. Had the client been aware at the selection stage of the fact they would not receive their statutory certification for the work then they may have made a different choice of contractor.

Let’s dig a little further into their website blurb...

pulsebs1

Oh lordy. “We are both Part-P certified”? What does that even mean?? Part-P is a building regulation, not a qualification as I’ve covered before. You can work to within the requirements of Part-P, but nobody has a framed certificate hanging on their wall to say they are ‘Part-P qualified or certified’, or if they do then some fly-by-night training provider has stiffed them on a bullshit electrical course. And besides, these boys clearly don’t know Part-P from the hairy-holes in their arses. They’re unable to self-certify the work through a CPS, they haven’t provided any evidence of lodging a planning application before starting this job, and they’ve provided no certificate of compliance for the work they've completed. They have failed here, in every way, to abide by the legal requirements of Part-P, regardless of what qualifications they think they have.

Personally, I only offer domestic or commercial work as industrial electrics scares the piss out of me. Imagine working with high voltages, heavy three-phase machinery, monster SWA cables and the like! And yet, I have decent electrical qualifications, NICEIC Approved Contractor status and ECA membership. I’m not claiming to be any kind of sparkie Superman, just that I know where my limitations and comfort zone lie, so how these jesters can claim to offer industrial services when the standard of their domestic work is as pants as this is beyond me. Maybe they think they can blag it if it ever comes up. Ten thousand Volts in the wrong place may one day change their minds, albeit only for a few microseconds before they end up as steaming puddles on the floor.

I'm guessing that because they mention schools and colleges, these chaps perhaps come from an acedemic background - school AV techs or something. Perhaps they got bored with plugging in projectors and thought they could make some 'easy' money offering electrical installation services, but I'd say they're out of their depth.

Interestingly enough, despite the lack of CPS accreditation and with work this bad, there are a couple of places you can find these comedians online as being ‘approved’. I’ve talked before about these trade directories who claim to vet their members and provide tradespeople you can rely on, well look who shows up on Rated People...

ratedpeeps

And also, disappointingly, the QuickFind directory which claims to carefully select and vet their 'trusted and approved' advertisers...

Quickfind

Notice the lack of any accreditation logos. Sure, QuickFind say that they check advertisers claiming trade association membership really have such, but if you’re a cowboy who is not claiming to be a member of a trade association and you’re operating outside of any, then it kind of falls on its arse, and in this case the client is left without a legitimate CPS channel to make a complaint through.

IMAG1734
The irony of QuickFind’s claims on the opposing page to the print ad for these numpties.


You may note there are no customer reviews at the time of writing on either Quickfind or Rated People's website. This is the problem I have with these directory services who throw around words like 'approved, trusted, vetted and rated', most of them only perform simple checks that their advertiers are solvent, have basic insurance and are valid members of any associations they claim to be members of, after that they're released to the unsuspecting public as being valid, vetted and trustworthy. It's only when clients have been screwed over will negative reviews start rolling in to warn off others. By then, the damage has been done and people are out of pocket as has happened here.

So, I told the clients I would start making good while compiling a report as I went along that they could use to try and get some recompense for the extra work I was now being appointed for, for anything which needed supplying/replacing, for the stress and inconvenience caused and for the accessories they had already paid for but not received. Yes, they had paid money in advance for this mess, something I never ask for.

Spoiler alert: plot twist approaching!

Many of the issues were resolved, the faulty LED strip, the poor terminations, the heating wiring, the incorrect switching, missing accessories and.....

...and then I turned up this week to receive a bollocking from the client. Remember I said one downlight had a dented bezel? Well, they chewed me out for being responsible.

Not in a nice way you understand. Not in an inquiring “I didn’t notice it like that before” probing kind of way. Literally an “I’m not arguing with you, you did that” accusation. Shocked? Why, I almost dropped my Pimms & lemonade!

Y’know, accidents happen. When swinging tools around on site, sometimes things get bashed or knocked, but I’ve always owned up to it. I figure sooner or later the client will notice, so it's best to put your hands up and maintain the integrity of your reputation. Small examples are mud trodden into a newly cleaned carpet, cracking the LCD screen on a smart meter monitor, and cracking a new light fitting (that’s happened twice). The worst example was working in a kitchen and scratching the glass on a new halogen hob, but in all cases I’ve come clean with the client, and where they have asked me to make good I’ve done so without argument.

Three hundred flimmin’ quid that new hob cost me!

It’s just good reputation-enhancing business practice, and I take it as a learning experience. These days, I ensure a glass hob is covered before working near one, I check delicate items for damage before starting work to ensure I won’t be accused of causing it afterwards, and I try to be especially careful with those horrible ceramic wall lights which can break if you twist the screws a little too tightly!

So, the accusation I was presented with somewhat grated with me on this one. As mentioned, the downlight could only have been damaged in carriage or on installation by dropping onto a hard surface, and although we had re-terminated it properly, we hadn’t dropped it. If we had, I’d have fitted another downlight. Nothing would have been easier. These are cheap models, and there’s an array of electrical distributors within five minutes’ drive of site, so there was no reason to try and conceal anything. It was easily resolvable, and at the equivalent cost of a couple of cups o' coffee.

Personally, I believe the client just didn’t notice the dented bezel before, but when we re-terminated it we placed it back in the ceiling at a different orientation which made it more obvious from certain vantage points. I offered that view, but was shot down like a liar or some kind of fool.

This is why, should this situation arise again, I will be unwilling to come to the rescue without first being paid to perform a full inspection and audit of all that is wrong. Call this another learning experience under the belt. I guess it doesn’t matter how old you are, there’s always something new to surprise you occasionally.

As a goodwill gesture, I have offered to replace the dinked downlight, but I’ve had to inform the clients that I cannot undertake any further work for them. We know there are all sorts of iffy issues the previous installer left us with, and I can’t run the risk of being blamed for something else they hadn’t noticed before. The precedent is set, so now they’ll have to find someone else to sort out the remaining mess.

I’ve submitted my invoice to date, but my almost completed report, which I had been working on in my own time, will only be sent to them once they cough up. Same with the replacement downlight which isn’t happening until funds are cleared. I’m not leaving them high and dry; the report is 90% done and I’m happy to see it through, but I can’t go back on the tools there and they’ve had a firm but polite email explaining why.

It’s a shame, but had they accepted my quote in January, they’d be in a working kitchen today with level accessories, operational lighting and all the paperwork sewn up. I like to think my price was competitive, so just how much cheaper were these guys, especially seeing as they changed the CU which I didn’t believe was necessary?

If they truly came in under my price, and by enough to tempt the client to plump for them instead of using me as a trusted installer they had employed in the past, then I guess you get what you pay for, but it goes to show that you should always choose your installer based on more than just the monetary figure written on the quote. If I cost more, it's because I have multiple avenues of consumer protection built in to the service I provide. NICEIC, ECA, Which? and TrustMark are all independent avenues a dissatisfied client of mine could take if they felt they had to complain about the service I provided, but to maintain my reputation I would try to ensure it never came to that. It's that value-added peace of mind which necessarily costs extra, and forking out for that at the start of a project makes more sense than going for the cheaper guy who ends up botching the job. I bet their quote, however much cheaper than mine it was, didn't state the work would be dangerous, half-arsed and require additional costs to make good.

Peanuts and monkeys folks.


Update 29/10/17

While out and about this morning I spotted their van now sporting a NAPIT logo. It seems this outfit have now managed to get themselves accredited. How they passed a NAPIT assessment when their quality of work is this bad I couldn't say. Obviously they didn't use this job as one of their assessment examples! Mind you, seeing as Cowboy Competition #4 and Cowboy Competition #5 were also NAPIT installers, it seems their standards are at about the right level for this lot.